~Major Reports

Final Construction Documents  Submitted to MSBA 10-27-2020

Construction Documents - 60% Completion 
Submitted to MSBA 7-9-2020

Construction Documents - 90% Completion  Submitted to MSBA 9-10-2020  

Detailed Design Submitted to MSBA 4-30-2020


Feasibility Study Schematic Design Submitted to MSBA 9-10-19
DESE Submission / DESE Letter of Approval

Acton Board of Health Approval of Septic Design

Schematic Design 

~SD Appendices, Vol. 1 and 2
   Appendices A-H, including Traffic Impact Report
   Appendices I-T
   Appendices U-Z
   Appendices AA-CC

Schematic Design Drawings
(Note: due to the number of drawings, this is a large document that may take a few minutes to download for viewing)

Schematic Design Project Manual

MSBA Comments on Schematic Design and District Response
Updated Project Schedule

MSBA Approval of Schematic Design and Budget


Feasibility Study Preferred Schematic Report (PSR)

Updated PSR submitted to MSBA 5-8-19

Volume 1                                         
Volume 2 (Appendices A-K)
Volume 2 (Appendices L-M)
Volume 2 (Appendices N-P)
Volume 2 (Appendices Q-T)
Volume 2 (Appendices U-Z)
Volume 3 (Appendices AA-EE)
Volume 3 (Appendix FF, part 1)
Volume 3 (Appendix FF, part 2)
Volume 3 (Appendix FF, part 3)
Volume 3 (Appendices GG-PP)

MSBA Review Comments on PSR

Presentation to MSBA Facilities Assessment Subcommittee (FAS) 6-5-19 

Feasibility Study Preferred Schematic Report (PSR) submitted to MSBA 2-20-19

Volume 1                                     
Volume 2 (Appendices A-K)
Volume 2 (Appendices L-N)
Volume 2 (Appendices O-P)
Volume 2 (Appendices Q-T)
Volume 2 (Appendices U-Z)
Volume 3 (Appendices (AA - EE)
Volume 3 (Appendix FF, part 1)
Volume 3 (Appendix FF, part 2)
Volume 3 (Appendix FF, part 3)
Volume 3 (Appendices GG-LL)

Revised Educational Program
 
and 
Appendices

MSBA Review Comments on PSR



Feasibility Study Preliminary Design Program (PDP)
 
submitted to MSBA 11-7-18

Educational Program (revised version in PSR section)
MSBA Review Comments on PDP
ABRSD Response to MSBA Review Comments on PDP, part 1
ABRSD Response to MSBA Review Comments on PDP, part 2
ABRSD Response to MSBA Review Comments on PDP, part 3
ABRSD Response to MSBA Review Comments on PDP, part 4
ABRSD Response to MSBA Review Comments on PDP, part 5
ABRSD Response to MSBA Review Comments on PDP, part 6
ABRSD Response to MSBA Review Comments on PDP, part 7



Dore and Whittier Reports

Executive Summary

Full Length Report



 